Labor and job quote calculator for contractors
Add up the crew, the materials, the drive and the dump run, set a contingency for surprises, and price it your way. Then print a clean line-item breakdown.
How the quote is built
Every line is a cost you enter. The calculator adds them in a fixed order, so you can check each step on the printout.
Crew hours people × hours each, added up
Direct job cost labor + materials + travel + disposal + other
Contingency direct job cost × contingency %
Job cost direct job cost + contingency
Overhead direct job cost × overhead % (or a flat amount)
Selling price cost × (1 + markup) or cost ÷ (1 − margin)
Gross profit selling price − job cost
Contingency, in plain words
A contingency is money set aside, inside the price, for things you can’t see yet. Here it’s a percentage of the direct job cost, shown as its own line so you (and your customer, if you share the breakdown) can see it.
- It is counted as a cost. The gross profit and margin shown assume you spend it. That’s the safe way to read a quote.
- If the job goes to plan, it stays with you. The breakdown shows that number too: “If the contingency isn’t needed”.
- It isn’t overhead. Overhead is the cost of running the business. Contingency belongs to this one job.
How big should it be? That depends on how much of the job you can see before you start, and only you know that. Read How to price labor on a job for a worked example with every number shown.
Quote the next job by talking through it
TalkEstimate keeps your own prices and rates in one list and builds the estimate from them while you talk through the job. You set every price; the AI only organizes what you said.
Not released yet · Android first · built and tested on a real phone
Questions contractors ask
What hourly cost should I use for my crew?
What an hour really costs you: the wage plus the payroll costs you pay on top of it. Your payroll records have the real number. Don’t use the rate you bill, or the markup gets counted twice.
Do I count my own hours?
Yes. If you do the work, your hours are a cost. Leave them out and the “profit” is really your wage.
Should travel time be labor or travel?
Either, as long as it’s counted once. Paid drive time can go in the crew hours; fuel, tolls and parking go in Travel.
What’s the “price per crew hour” for?
It’s the selling price divided by the crew hours. It shows what the job really brings in per hour of work, which is handy for comparing jobs or checking a flat price.
Where do the numbers go?
Nowhere. The math runs in your browser and nothing you type is sent to us. On talkestimate.com we count that the calculator was used, never what you typed.